Aaaaaand, we are done!




This was a complete redesign of our network to make sure that we will never suffer from another STP layer2 loop again, along with increasing the inter switch trunk capacity 20x (leaf) & 40x (spine) times over... We have also removed all but one of the older 100Mbit switches (MSTP capable) as we'll keep it around to use for internal systems that don't need or support Gbit speeds... No sense in wasting port density for things that don't need it...
Thank you everyone for your patience and understanding as we worked through all 6 phases of our network upgrades spread over multiple late nights...
Also a special thanks to the entire FutureQuest team for working with me to make this upgrade a reality, along with special recognition to Kevin for going way above and beyond to see this through with minimal problems...